Tank Farm Recoat

 

Project consisted of Pressure washing and Recoating five ethanol storage tanks

Sandblasting and Coating Newly Erected Structure

 

Project consisted of Sandblasting, and Applying a 3 Coat Epoxy System to a new Fuel Tank

BEFORE
BEFORE
DURING
DURING
AFTER
AFTER

Full Containment Sandblasting & Coating

 

Project consisted of Sandblasting, and Applying a 3 Coat Epoxy System to 20 Petroleum Storage Tanks with Full Containment.

BEFORE
BEFORE
DURING
DURING
AFTER
AFTER

Warehouse Coating

 

Project consisted of Coating the Ceiling Grid and Support Structures for a Newly Constructed Food Processing Plant.

Confined Space Sandblasting & Coating

 

Project Consisted of Working in a Confined Space Sandblasting and Lining 4 Iron Manganese Water Filters at a Water Treatment Plant.

INSIDE
INSIDE

Confined Space Sandblasting & Coating with Scaffolding

 

Project consisted of Sandblasting and Lining the Interior of 8 Fermentation Tanks at an Ethanol Plant.

BEFORE
BEFORE
AFTER
AFTER

New Pipe Coating and Marking

 

Project consisted of Pressure Washing, Recoating, and Labeling Water Pipelines

BEFORE
BEFORE
AFTER
AFTER